Browse Items (436 total)

002-003-004.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-005.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-006.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-007.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-008.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-009.jpg
Cleared path in preparation of paving Observatory Hill Road. Hair-pin turn.

002-003-010.jpg
Cleared path in preparation of paving Observatory Hill Road. Hair-pin turn.

002-003-011.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-012.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-003-013.jpg
Cleared path in preparation of paving Observatory Hill Road.

002-004-001.jpg
Architectural floor plans of sub-basement floor of 1950s wing.

002-004-002.jpg
Architectural floor plans of basement floor of 1950s wing.

002-004-003.jpg
Architectural floor plans of the entire 1950s wing.

002-004-004.jpg
Architectural floor plans of second floor of 1950s wing.

002-004-005.jpg
Architectural floor plans of first floor of 1950s wing.

002-005-001.jpg
Removal of front door of 1920s wing.

002-005-002.jpg
Foundation and rock.

002-005-003.jpg
Foundation and basement of the new wing.

002-005-004.jpg
Brick walls being built for the new wing.

002-005-005.jpg
Contruction in front of the 1920s previous front door.

002-005-006.jpg
Removal of trees in front of 1950s wing.

002-005-007.jpg
Removal of trees in front of 1950s wing.

002-005-008.jpg
Removal of trees in front of 1950s wing.

002-005-009.jpg
Removal of trees in front of 1950s wing.

002-005-010.jpg
Contruction in front of the 1920s previous front entrance.

002-005-011.jpg
Ramp leading up to newly constructed brick wall.

002-005-012.jpg
Front side of new wing after contrction of three floors.

002-005-013.jpg
Front side of new wing after contrction of three floors.

002-005-014.jpg
Front side of new wing after contrction of three floors.

002-005-015.jpg
Contruction in front of the 1920s previous front entrance.

002-005-016.jpg
Construction of second floor of new wing.

002-005-017.jpg
Ramp leading to the second floor of new wing.

002-005-018.jpg
New addition of cedar siding and stucco. Truck parked outside.

002-005-019.jpg
Previous front door of 1920s wing.

002-005-020.jpg
Front side of new wing and truck parked on site.

002-005-021.jpg
Nearly complete 1950s wing as see from the front side.

002-005-022.jpg
Photo taken from top floor of new wing in the direction of the Plaskett Dome. Dome visible in the background.

002-005-023.jpg
Completed 1950s wing and parking lot on the front side of the building.

002-005-024.jpg
Old side entrance of 1920s wing and side view of 1950s wing.

002-005-025.jpg
New addition of cedar siding and stucco.

002-005-026.jpg
Removal of trees in front of 1950s wing.

002-005-027.jpg
Front side of 1950s wing. Construction of first floor.

002-005-028.jpg
Drawing of proposed 1950 wing.

002-005-029.jpg
Removal of trees in front of 1950s wing.

002-006-001.jpg
Side view of 1920s and 1950s wings.

002-006-002.jpg
Front side of 1950s wing showing three floors being constructed.

002-006-003.jpg
Front side of 1950s wing showing three floors being constructed.

002-006-004.jpg
Photo taken from top floor of new wing in the direction of the Plaskett Dome. Dome visible in the background.

002-007-001.jpg
Excavation for the 1950s wing.

002-007-002.jpg
Excavation for the 1950s wing.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2