Browse Items (136 total)

hist-002.jpg
A picture taken at the top of Observatory Hill before the site preparation had begun

hist-003.jpg
A picture taken at the top of Observatory Hill before the site preparation had begun

hist-004.jpg
A picture taken at the top of Observatory Hill before the site preparation had begun

hist-009.jpg
A picture of three unidentified men at an unknown location on Observatory Hill

hist-010.jpg
A picture of a group of men and woman on a sunny day on Observatory Hill. J.S. Plaskett is included in the photograph

hist-011.jpg
A picture of a family with a small refractor telescope on a tripod. The views from Observatory Hill attracted people

hist-012.jpg
A picture of a woman and three young woman taken at a lake.

hist-024.jpg
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.

hist-025.jpg
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.

hist-026.jpg
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.

hist-028.jpg
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.

hist-029.jpg
Machines used during construction were steam-powered. This water tower was used to keep a supply of water on hand.

hist-030.jpg
The water used during construction was obtained from a well drilled on the site. This proved to be more practical than hauling water up the hill.

hist-031.jpg
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible

hist-033.jpg
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible.

hist-034.jpg
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible. The water tower is visible in the backgroud

hist-035.jpg
Men mixing cement are visible in this picture. The bucjets of concrete needed to be raised up and poured into the finished forms.

hist-036.jpg
In this picture ths shute used to move concrete into the completed forms.

hist-037.jpg
In this picture the lower parts of both the north and south piers (combined in one piece) is completed and the forms for both piers appears to be completed. The water tower is visible in the background

hist-038.jpg
In this picture the lower parts of both the north and south piers (combined in one piece) is completed and the forms for both piers appears to be completed.

hist-039.jpg
This picture provides a good view of the archway between the two pieres. This archway is a notable feature when one is inside the completed telescope and dome.

hist-041.jpg
A picture of the completed piers with three men that gives a sense of the scale. The concrete floor of the building is also completed in this picture.

hist-091.jpg
A group image of the dome assembly crew. Note that the two engineers, one holding the blueprints, are clean compared to the workers. This picture was taken inside the dome.

hist-092.jpg
A picture of the steel structure of the dome mostly completed. The cement pier is visible inside the dome, and a crane and the water tower are also visible.

hist-097.jpg
A picture of the dome with the steel structure completed and the lower half of the outer paneling completed. There appears to be snow on the ground around the bottom of the dome. Note the man standing on top of the dome.

hist-101.jpg
A picture of the dome with the steel structure completed and the lower half of the outer paneling completed. A man is standing on theground in front of the dome

hist-102.jpg
A picture of the dome with the lower paneling more or less completed. The inner stairs that lead to the observing floor are clearly visible. There are two men visible, one standing on what will be the observing floor, and a second on a small…

hist-103.jpg
A picture of the partially covered upper dome with a man standing on scafolding. The large opening in the lower half of the dome is where they brought the pieces of the telescope into the dome.

hist-106.jpg
A picture of the polar axis of the telescope on a wagon drawn by 8 horses. The picture is taken on Douglas Street in front of the Maywood Meat Market located at the cornerof Douglas and Alpha. Notice the street car tracks on the road and that team of…

hist-107.jpg
A picture of the polar axis on Glanford Avenue on its way to the observatory. It is not clear what is in the cart being hauled by two horses. The picture is taken looking south

hist-108.jpg
A picture of the polar axis on Glanford Avenue on its way to the observatory. It is followed by a cart drawn by two horses and an automobile

hist-109.jpg
A picture of the polar axis on Glanford Avenue on its way to the observatory. The picture is taken looking northwest

hist-110.jpg
A picture of the polar axis on Glanford Avenue on its way to the observatory. The picture is taken looking northwest

hist-111.jpg
A picture of the polar axis and a team of horses at the hairpin curve on Observatory Hill road. It appears the teams of horses are being given a break before the next part of the ascent.

hist-112.jpg
A picture of the polar axis being hauled by a team of 12 horses. It is near the top of the hill, at the Director's House. The mostly completed dome is visible through the trees. Is the person standing in front of the dome J.S. Plaskett waiting for…

hist-113.jpg
A picture of the polar axis being hauled by a team of 12 horses. It is near the top of the hill, just before the Director's House. The mostly completed dome is visible through the trees. Is the person standing in front of the dome J.S. Plaskett?

hist-115.jpg
A picture of the polar axis on a horse-drawn wagon at the top of Observatory Hill.

hist-116.jpg
A picture of the polar axis being removed from the cart. To do this, the cart had to be dismantled

hist-117.jpg
A picture of the polar axis of the telescope being chained to a winch so that it can raised into the dome.

hist-118.jpg
A picture of the lower part of the telescope being hauled up the Observatory Hill road by a team of horses. The hollow tube would attach to this piece which would be attached to the polar axis. The spectrograph would hange off one end.

hist-119.jpg
A picture of the telescope tube being hauled up the Observatory Hill road by a team of horses.

hist-120.jpg
A picture of the telescope tube after being removed from cart at the site. The front portion of tube resting on blocks and wagon visible

hist-121.jpg
A picture of a team of horses hauling telescope parts to the top of the hill. They are at the top of Observatory Hill in front of the water tower

hist-122.jpg
A picture of a team of horses hauling telescope parts in front of the site custodian house at top of Observatory Hill road

hist-123.jpg
This is a view of the top of Observatory Hill with the site custodian's house on the left, and the dome to the right. The water tower is just visible at the top right of the picture. A man is visible sitting on the railing leading to the house

hist-128.jpg
A picture of the polar axis, drive gear and bearings assembled ready to be hoisted into place on top of the two piers. A workman is sitting on the top.

hist-131.jpg
A picture of three men working on assembling the telescope. It appears as if they are attaching the declination axis to the polar axis.

hist-137.jpg
A picture of the telescope fully assembled and all wooden supports removed. Thomas Tenant Hutchison is standing on the right ascension gear. Hutchison would join the staff of the observatory when it began operation. He maintained the telescope and…

hist-139.jpg
A picture of the lower part of the completed telescope. The electrical panel is attached to the south pier. Thomas Tenant Hutchison has his arm on the declination counter-weight. Hutchison would join the staff of the observatory when it began…

hist-145.jpg
A picture of workers preparing to install the primary mirror. The mirror is hanging in the middle of the picture with its surface covered. Visible in the background are the two clocks used by observers. One kept normal time, the other sidereal time.…
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2