Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.
Once there was a road to the top of Observatory Hill, construction on the telescope began. The first task is to prepare the site by removing trees and leveling the area.
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible.
A picture showing the massive concrete pier under construction. The lower part of the north pier has been poured and the metal frame of the form for the upper part is visible. The water tower is visible in the backgroud
In this picture the lower parts of both the north and south piers (combined in one piece) is completed and the forms for both piers appears to be completed. The water tower is visible in the background
In this picture the lower parts of both the north and south piers (combined in one piece) is completed and the forms for both piers appears to be completed.
This picture provides a good view of the archway between the two pieres. This archway is a notable feature when one is inside the completed telescope and dome.
A group image of the dome assembly crew. Note that the two engineers, one holding the blueprints, are clean compared to the workers. This picture was taken inside the dome.
A picture of the steel structure of the dome mostly completed. The cement pier is visible inside the dome, and a crane and the water tower are also visible.
A picture of the dome with the steel structure completed and the lower half of the outer paneling completed. There appears to be snow on the ground around the bottom of the dome. Note the man standing on top of the dome.
A picture of the dome with the steel structure completed and the lower half of the outer paneling completed. A man is standing on theground in front of the dome
A picture of the dome with the lower paneling more or less completed. The inner stairs that lead to the observing floor are clearly visible. There are two men visible, one standing on what will be the observing floor, and a second on a small…
A picture of the partially covered upper dome with a man standing on scafolding. The large opening in the lower half of the dome is where they brought the pieces of the telescope into the dome.
A picture of the polar axis of the telescope on a wagon drawn by 8 horses. The picture is taken on Douglas Street in front of the Maywood Meat Market located at the cornerof Douglas and Alpha. Notice the street car tracks on the road and that team of…
A picture of the polar axis on Glanford Avenue on its way to the observatory. It is not clear what is in the cart being hauled by two horses. The picture is taken looking south
A picture of the polar axis and a team of horses at the hairpin curve on Observatory Hill road. It appears the teams of horses are being given a break before the next part of the ascent.
A picture of the polar axis being hauled by a team of 12 horses. It is near the top of the hill, at the Director's House. The mostly completed dome is visible through the trees. Is the person standing in front of the dome J.S. Plaskett waiting for…
A picture of the polar axis being hauled by a team of 12 horses. It is near the top of the hill, just before the Director's House. The mostly completed dome is visible through the trees. Is the person standing in front of the dome J.S. Plaskett?
A picture of the lower part of the telescope being hauled up the Observatory Hill road by a team of horses. The hollow tube would attach to this piece which would be attached to the polar axis. The spectrograph would hange off one end.
This is a view of the top of Observatory Hill with the site custodian's house on the left, and the dome to the right. The water tower is just visible at the top right of the picture. A man is visible sitting on the railing leading to the house
A picture of the polar axis, drive gear and bearings assembled ready to be hoisted into place on top of the two piers. A workman is sitting on the top.
A picture of the telescope fully assembled and all wooden supports removed. Thomas Tenant Hutchison is standing on the right ascension gear. Hutchison would join the staff of the observatory when it began operation. He maintained the telescope and…
A picture of the lower part of the completed telescope. The electrical panel is attached to the south pier. Thomas Tenant Hutchison has his arm on the declination counter-weight. Hutchison would join the staff of the observatory when it began…
A picture of workers preparing to install the primary mirror. The mirror is hanging in the middle of the picture with its surface covered. Visible in the background are the two clocks used by observers. One kept normal time, the other sidereal time.…